Avior Aqua

Nanobubble case studies from India

Eight pilots across lakes, sewage, industrial effluent, turf, aquaculture and hydroponics, each with its data and the scale of the trial. Open a case study to see the equipment, the method and what the data does not show.

Wankhede Stadium, Mumbai, after the pilot: the ground under floodlights during an evening match

How we work

Every figure on this site comes from the pilot report for that project. We state the scale, any co-treatments and what was not measured. Percentage changes are calculated from the tables. Results depend on the site, and we agree targets with you after a water assessment.

Our completed lake pilot at Nagar Bhavan Lake, Mira Bhayandar, is below. Our project at Rao Talao, also in Mira Bhayandar, is ongoing; its laboratory results to date are below.

Industrial ETP, Freudenberg NOK, Morinda

Industrial effluent (ETP) · Installed September 2026

Sludge down 23.3%, coagulant down 22.8% and energy use down 26.9% in October 2026, the first full month after installation.

Read the case study

Nagar Bhavan Lake (Mandali Talao), Mira Bhayandar

Lake, completed pilot · Completion certified 12 September 2025

MBMC certified BOD down 53%, COD down 65%, TSS down 53% and a 100% increase in dissolved oxygen. Nanobubble generators with bioremediation.

Read the case study

Rao Talao, Mira Bhayandar

Lake rejuvenation, ongoing · Results as of November 2026

6,000 m³ urban pond - turbidity 94 to 1.0 NTU

Read the case study

Pirana sewage treatment plant, Ahmedabad (180 MLD)

Wastewater, bench trial · 3 to 5 December 2024 (bench-scale trial)

COD from 145.88 to 20.84 mg/L with oxygen; E. coli below 2 MPN/100 mL with ozone. One sample, 60-minute batches.

Read the case study

Wankhede Stadium, Mumbai

Turf irrigation water · 8 May to 10 June 2025 (33 days)

Ammonia from 1.5 to below 0.5 mg/L, TDS from 750 to 550 mg/L over 33 days.

Read the case study

Tengra tank trial, Hajo, Assam

Aquaculture, tank trial · 15 November 2025 to 25 February 2026 (reported as a 100-day trial)

Day-100 survival 88% in the control against 95% and 92% in nanobubble tanks.

Read the case study

Open-pond carp pilot, Nadipar, Assam

Aquaculture, pond pilot · 6 April to 10 July 2026 (reported as a 100-day cycle; closing water readings on day 90)

Dissolved oxygen 3.5 to 7.6 mg/L and pond biomass about 3.5 times over 100 days. No control pond.

Read the case study

Rucon Hydroponics

Hydroponics, seedlings and microgreens · Seedling, basil and microgreens trials

Germination 80.25% against 69.75% across four crops, faster basil seedlings and basil that came through peak summer.

Read the case study

Tell us about your water body or plant

We agree targets after a water assessment, then run a pilot before any scale-up.

Request a site assessment